The Combine Forum banner
1 - 3 of 3 Posts

·
Registered
Joined
·
7 Posts
Discussion Starter · #1 ·
Only thing I dislike about getting tile put in with a trencher is dealing with the mounds. Ideally I like to let them settle and then lightly run over withy the chisel in the fall and maybe again in the spring and then field cultivator. What is your preferred method? Thanks
 

·
Registered
Joined
·
4,799 Posts
We plow ours in but it is the worst part of tiling. We built a small disk to pile the dirt back all on top of the row and then roll it with a land roller to try and pack it back down somewhat. Then usually vertical till it in the spring. It's not perfect.
 
1 - 3 of 3 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top